Product Applications

Services

Fit Right Guarantee

If it doesn’t Fit Right, it’s not Fit Tight.

As part of our dedication to producing the highest quality insulation covers on the market, we guarantee that our products will fit.  Please contact Calvin Brasel directly with any questions or concerns about your Fit Tight Cover.

Design Process

Field Services

The first step in designing your custom Fit Tight Cover is obtaining accurate measurements.  We can send a trained representative to your facility to quickly measure the equipment.  These measurements are then transferred electronically to our design department to begin development immediately.
FTC in Nashville

Custom Engineering

The measurements are used by our experienced design specialists to create a template on our CAD software.
OLYMPUS DIGITAL CAMERA

 

 

 

 

 

 

 

Our CNC machine then uses this template to cut the material to the exact measurements of your equipment Check out the video to see our CNC Machine at work.

Fabrication

Our in-house designers, seamstresses, and stuffers have more than 50 years of combined experience creating removable insulation covers.  They use the custom patterns from our design department to fabricate high-quality covers made to fit your equipment.

IMG_20110819_122316

Quality Check

Before each Fit Tight Cover is shipped, we perform a complete Quality Check – dimensions and measurements are confirmed, materials are verified, and seam strength is tested.

Shipping

After the Quality Check, Fit Tight Covers are packaged with extensive labeling and detailed instructions to make installation as simple as possible.

OLYMPUS DIGITAL CAMERA

  • Fit Tight Cover Benefits

    • Energy Conservation
    • Personnel Protection
    • Freeze Protection
    • Fire Protection
    • Labor / Material Savings
    • Sound Attenuation
    • Reduced Room Temperature
    • Maintaining Process Control Temperature
    • Reduced Operation Cycles of Equipment
    • Reduction in Waste Material
  • Upcoming Events

FIT TIGHT NEWS

rss
  • OCT30
    Calvin’s Weekly Update

    The MICA fall meeting was a success!

    Read Full Article
  • OCT13
    Calvin’s Weekly Update

    12 hours notice to be in Nevada? No problem.

    Read Full Article